Improving east-west mobility and providing additional evacuation route for northeastern cameron county.
The Outer Parkway (CSJ: 0921-06-283) is an approximately 21.5-mile proposed four-lane divided highway extending from I-69E (U.S. 77) near the North Cameron County Line to FM 1847. The project will provide a new east-west travel route through northeastern Cameron County and will connect with General Brant Road and I-69E (U.S. 77).
Project Highlight
The Outer Parkway is an important component of regional transportation planning. The project is intended to improve east-west connectivity and provide additional transportation capacity in northern Cameron County. Together with other planned regional improvements, the Outer Parkway will also support an additional hurricane evacuation route and enhance safe passage throughout the region to provide new location non-toll freeway.
Project Status
The environmental and preliminary engineering phases are currently ongoing. Right-of-way and utility coordination, design, and funding remain pending.
Public Involvement
Virtual Public Meeting with In-Person Option
From I-69E/US 77 to FM 106/General Brant Road
CSJ: 0921-06-283
Cameron County, Texas
| Public comment deadline | All comments must be received on or before Monday, September 14, 2026. |
| Virtual details | The virtual public meeting contents will be available starting on Wednesday, August 26, 2026, by 5 p.m. |
| In-person details | The in-person open house option will be held on Thursday, August 27, 2026, from 5:30 p.m. to 7:30 p.m. at the Rio Hondo Civic Center, 121 N. Arroyo Boulevard, Rio Hondo, Texas 78583. |
| Purpose | The purpose of the project is to enhance east-west mobility and facilitate evacuation in northeastern Cameron County. The identified needs include limited east-west mobility due to insufficient transportation infrastructure, hindered emergency response, and impeded efficient hurricane evacuation. |
| Description | CCRMA is proposing a new-location, four-lane divided highway from I-69E/US 77 to FM 106/General Brant Road in Cameron County. The approximately 22-mile project would be constructed in two phases. Phase I (interim design) would primarily consist of two 12-foot travel lanes, one in each direction, with two 10-foot shoulders. Phase II (ultimate design) would consist of two main travel lanes and two frontage road lanes, where justified, in each direction. ROW would generally be approximately 300 feet wide, expanding to 500 feet at intersections with existing roadways during Phase II.
The project would intersect FM 507, the future extension of FM 509, FM 2925, FM 803, and FM 1847, in addition to I-69E/US 77 and FM 106. Subject to final design, the project would require additional ROW and could potentially displace residential and non-residential structures. Construction would involve wetlands and an action in a floodplain. |
| Accessibility | The meeting will be conducted in English. Interpretation/document translation will be provided for those who need it, and accommodation can be made for persons with disabilities. Requests should be made to Mirna Sanchez at (956) 926-5016 no later than 4:00 p.m. Thursday, August 20, 2026. Advance notice is required for some services/accommodation. |
| Meeting materials | |
| How to make a comment | Written or verbal comments from the public regarding the proposed project are requested and may be provided at the public meeting.
Written comments may be submitted by mail to RRP Consulting Engineers, LLC, 5400 N. 10th Street, McAllen, Texas 78504. Written comments may also be submitted by email to OuterParkway@rrpeng.com. All comments must be received on or before Monday, September 14, 2026. For general questions or concerns regarding the proposed project or public meeting, please contact Daniel Garces, P.E., Project Manager, at (956) 926-5000 or OuterParkway@rrpeng.com. |