Community Partners

Cameron County and CCRMA Agreements:

Date Agreement
4.11.06 Provide initial loan of funds associated with creating of CCRMA
5.23.06 North Rail and FM 509 to prepare route analysis, schematic, EA and finding of no significant impact
8.21.07 North Rail and FM 509 Amended Agreement (2007C08189)
9.18.07 Administrative Services for County to allow personnel to assist CCRMA in managing and overseeing projects of the CCRMA (2007C09224)
3.25.08 Acquire ROW for West Rail (2088C03076)
9.23.08 CCRMA reimburse County for Administrative Services (2008C09333)
4.2.09 EA, ROW, Design & Engineering for FM 509 (2009C04014)
10.15.09 CCRMA reimburse County for Administrative Services (2009C10359)
12.22.09 West Rail MOU UPRR/County/RMA (2009C12452)
2010 Transportation Program and Pledge Agreement
2.16.10 Olmito Switchyard Engineering and Design (2010C02065)
2.18.10 Olmito Switchyard County/Hgn/RMA/UPRR (2010C02048)
4.15.10 CCRMA reimburse County for Administrative Services (2010C09361)
4.15.10 West Rail Agreement Engineering and Design (2010C04122)
8.5.10 East Loop Agreement EA from FM 3068 to SH 4 (2010C08283)
9.30.10 CCRMA reimburse County for Administrative Services (2010C09361)
7.7.11 CCRMA to provide coordination in developing for Flor de Mayo Bridge (2011C07205)
9.21.11 CCRMA reimburse County for Administrative Services (2011C09300)
12.20.11 TRZ No. 1 – CCRMA Development Program (2011C11368)
12.17.12 Agreement for Marketing and Accounting employees (2012C12543)
12.17.12 TRZ No. 2 – CCRMA Development Program (2012C12546)
4.12.13 Repair wash out at header bank at SH 550 and FM 1847 Overpass (2013C03111)
8.15.13 CCRMA Executive Director Agreement with County 2013C08252)
8.23.13 Port Bridge Project County/RMA/BND (BND #3958)
12.12.13 CCRMA provide coordination in developing Bi-National Projects
2.1.14 SH 550 Funding & Development Agreement 1st Amendment
10.9.14 SH 550 Toll Road Operation of an Interoperability System (2014C10338)
3.5.15 SH 550 Funding & Development Agreement 2nd Amendment
10.6.15 CCRMA reimburse County for Administrative Services (2015C10279)
12.29.15 Transfer, assignment, pledge and/or payment of a portion of the tax increment account funds for the development of transportation projects (2015C12355)
4.12.16 CCRMA to assist County in securing funding through the 2015 Fixing America’s Surface Transportation (FAST) and other federal fund for project the County is developing (2016C04089)
11.1.16 SH 550 Funding & Development Agreement 3rd Amendment
11.1.16 CCRMA reimburse County for Administrative Services (2016C11315)
8.15.17 Agreement to allow CCRMA to develop Project on behalf of the County (2017C08237)
10.17.17 CCRMA to provide IT Staff support (2017C10317)
2.6.18 Old Alice Road (2018C02039)
4.12.18 Port Connector Road (2018C04089) County.BND.RMA to advance project through Design/Engineering Phases

Interlocal Agreement

1) City of Brownsville

Date Agreement
5.15.07 Infrastructure Development Agreement 10.1.2006 to 9.10.07
7.17.07 East Loop Pass Through Financing Agreement
4.3.18 Develop Highway and Airport Projects Interlocal (approved by RMA 5.10.18)

2) City of Harlingen

Date Agreement
4.18.07 North Rail & FM 509 Extension Agreement
7.18.07 Prepare MOU to relocate switchyard in Harlingen
2.18.10 Cty/Hgn/RMA/UPRR Olmito Switchyard

3) City of Los Fresnos

Date Agreement
4.10.18 Whipple Road Agreement – Environmental and Design Phase
2018 Henderson Road in the works

4) City of Pharr

Date Agreement
6.2.15 Toll Collection System at the Reynosa International Bridge Agreement w/City of Pharr
6.5.17 Toll Collection System at the Reynosa International Bridge Agreement w/City of Pharr

5) City of San Benito (no agreement found)

6) Brownsville Navigation District

Date Agreement
12.15.09 CCRMA to work toward development of SH 550 to include construction of non-tolled frontage roads east and west side of the Project and also construct a connector road to connect to SH 48 south of the POB
1.14.10 SH 550 Wetlands Mitigation for SH 550 Project
7.26.10 SH 550 Wetlands Mitigation
8.21.13 Port Bridge Project CCty/RMA/BND (see under County Agreements)
8.17.16 SH 32 prepare Environmental Assessment (BND Contract No. 4105)
4.19.17 Port Connector Project Agreement
4.12.18 Port Connector Road (2018C04089) County.BND.RMA to advance project through Design/Engineering Phases

7) Development Corporation of Harlingen

Date Agreement
7.5.06 CCRMA to provide feasibility and practicability studies, research and development and estimates of costs, expense, revenue, etc…..

8) Hidalgo County Regional Mobility Authority

Date Agreement
1.14.16 FM 1925 Agreement (tabled)
6.6.17 FM 1925 Agreement (tabled)
11.9.17 HCRMA (Executive Session item)

9) Port Isabel Economic Development Corporation

Date Agreement
12.19.06 Infrastructure Development Project Agreement with PIEDC 10.106 to 9.30.07

10) PUB (Brownsville)

Date Agreement
12.14.06 West Weir Project (West Loop Rail Relocation)
4.26.07 Weir Project

11) Star County Industrial Foundation

Date Agreement
4.12.18 Interlocal to Manage and Develop Projects in Starr County